How to commute to Arcovia from Alibi Lounge and Bar?

Last Updated on October 19, 2023

Get to Arcovia from Alibi Lounge and Bar via BUS

Public Transport Guide

  1. Walk

    Distance 689 m

    1. DEPART on to Civic Drive
    2. LEFT on to Market Drive
    3. RIGHT on to path
    4. RIGHT on to MMDA Alabang Viaduct Footbridge
    5. CONTINUE on to footbridge
    6. LEFT on to Starmall Metropolis Footbridge
    7. LEFT on to Starmall Metropolis Footbridge
    8. LEFT on to steps
    9. RIGHT on to service road
  2. BUS

    Ride 15: BGC - Alabang via SLEX, Bicutan, Sucat

    From: South Luzon Expressway / Montillano St Intersection, Muntinlupa City

    To: Carlos P. Garcia Ave. near British Embassy, Taguig City

    Fare: ₱44.25

    Provider: LTFRB Service Contracting (PUB)

  3. BUS

    Ride 16: Eastwood Libis - Marriot Term via Acropolis

    From: Carlos P. Garcia Ave. near British Embassy, Taguig City

    To: Eulogio Rodriguez Jr Ave., Pasig City

    Fare: ₱17.75

    Provider: LTFRB Service Contracting (PUB)

  4. Walk

    Distance 394 m

    1. DEPART on to service road
    2. RIGHT on to Carlo J. Caparas Street
    3. RIGHT on to sidewalk

Alibi Lounge and Bar

About Alibi Lounge and Bar

The Alibi Lounge Bar is secluded in the Crimson Hotel Filinvest City in Alabang, serving gin and cocktails. The hotel is located in the Entrata Urban Complex, along Civic Drive, Filinvest City, Alabang.

Arcovia

About Arcovia

Construction of Arcovia City started in early 2015. The development is designed by Filipino architect Carlos Arnaiz. The first phase of construction is expected to be completed by 2019. Arcovia City is a mixed-use development located by the Marikina River east of Ortigas Center being developed by the Megaworld Corporation. The centerpiece of the development is a triumphal arch surmounted by a bronze sculpture of a charioteer emperor accompanied by three horses called the Arco de Emperador. The township will have residential condominiums, a retail hub, LEED-registered office towers and over a thousand trees dotting the mixed-use community. Construction of Arcovia City started in early 2015 and the first phase of construction is expected to be completed by 2019.

Content by Wikipedia and OpenAI
© Image from Wikipedia
Sakay.ph
The Best Commuting Directions in Metro Manila